Elastic and subsurface bridge expansion joints

Rousínov

ROUSÍNOV BRIDGE NO. Č. 430-011

Investor/Contracting Authority: Road Repair Authority of the South-Moravian Region
 
Project description:
Repair of Tarcomastics elastic joints.
The total length of the completed joints is 57 m. The size of the closures is 500 x 50 mm.