Project description:
The subject of the construction was the reconstruction of the sewage system, incl. sewer connections by open excavation from ovoid concrete pipes with basalt gutter DN 500/750 from concreted stoneware DN500, DN 400, DN 200, DN 150 in the following total lengths:
- DN 500/750 length 502.11 m
- DN 500 length 10.41
- DN 400 length 321.35 m
- DN 200 length 214.90 m (28 connections)
- DN 150 length 288.70 m (39 connections)
- Number of inspection shafts: 25
Reconstruction of the water supply line, including connections with an open excavation made of ductile cast iron DN 150, DN 100, DN 80 in the following total lengths:
- DN 150 length 266.90 m
- DN 100 length 119.19 m
- DN 80 length 41.74 m
Relocation of water supply line made of ductile cast iron DN 100, DN 80 in the following total lengths:
- DN 100 length 111.35 m
- DN 80 length 26.85 m
Relocations of the gas pipeline, including connections:
- DN 160 PE SDR 17.6 length 27.70 m
- DN 150 steel length 0.40 m
- DN 50 PE SDR 11 length 2.00 m