Project description:
The subject of the contract was the reconstruction of the road within and outside of the municipality. Cracks in the base course were repaired outside the municipality and these cracks were treated with geocomposite reinforcement.
- Composition of layers: ACL 16 + thickness 50 mm and ACO 11 + thickness 40 mm.
- In the urban area of the municipality, only the replacement of the wearing course ACO 11+ in th. 50 mm was carried out.
- The work also included repairs to the original culverts and a complete replacement of one of them.
- Laying had to be done without a central joint.
- Two paver-finishers were used on a hot joint.
- Total area 29 800 m2