Laying of bitumen surfaces

Hodonín

I/55 HODONÍN – RAMPS

 
Project description:
  • The proposed construction presented the repair of the ramps on road I/55 in Hodonín. The work involved milling-off the original wearing course and base course of a thickness of 110 mm. The new base course has a thickness of 60 mm and the new wearing course has a thickness of 50 mm.
  • The total length of the road section being repaired was 1 328 m.
  • Total area laid 5 123 m2.
  • The construction was divided into two ramps with a length of 664 m.
  • The project was finished in 8 days