Renovation of concrete structures

Brno-Nový Lískovec

BRNO, NOVÝ LÍSKOVEC RESERVOIR - REHABILITATION OF THE ARMATURE CHAMBER LINING AND REPAIR OF THE ROOF COVER ABOVE THE CHAMBER

Investor/Contracting Authority: Brněnské vodárny a kanlizace, a.s.
 
Project description:
This project involved the repair of the reservoir armature chamber - rehabilitation of the interior structures (ceiling, slopes, walls, bottom and columns) using the Vandex remediation system - preparation of the substrate with subsequent application of spray mastic on an area of 1 358, replacement of the chamber piping..

In addition, surfaces in the armature and entrance chamber were repaired (ceiling, walls, staircase, bottom) and the chambers were ventilated.

The project also included the repair of the waterproofing roof layer above the armature chamber spanning an area of 555 m2.