RECONSTRUCTION OF AN OVERPASS OVER THE RAILWAY LINE AND THE CITY STREET AT KM 125 + 269 OF ROAD NO. 94 IN OŁAW, RENOVATION OF THE SUPPORTING STRUCTURE AND SUPPORTS

Investor/Contracting Authority: Generalna Dyrekcja Dróg Krajowych i Autostrad, Oddział Wrocław, Powstańców Śl. 186, 53-139 Wrocław
 
Project description:
  • Repair of supports No. 11 and 15 located on the territory of PKP - railway station Oława at km 154.352 of line No. 132, worth 313 878.61 PLN excluding VAT and in the range of:
  • Lifting the load-bearing structure and carrying out work during road and rail traffic.
  • Demolition of the corroded concrete shell of the rail and the support columns.
  • Replacement of 27 elastomer bearings.
  • Implementation of a new reinforced-concrete shell on columns and supports together with anti-corrosion protection of concrete surfaces.
  • Repair of the load-bearing structure together with the repair of supports No. 12, 13 and 14 located on the territory of PKP - railway station Oława at km 154.352 of line No. 132, worth 5 783 816.51 PLN excluding VAT and in the range of:
  • Implementation of temporary transport measures on state and regional roads – repair of the overpass was carried out during road and rail traffic, in halves in sections of about 155 m.
  • Demolition of the load-bearing structure: bituminous surface, safety elements (barriers, railings), modular expansion joints, reinforced-concrete pavements, reinforced-concrete bridge decks in beam spans type WBS and Płońsk, corroded parts of the bridge deck in monolithic spans, corroded concrete layers on supports no. 12 , 13 and 14.
  • Implementation of a new reinforced concrete bridge deck together with underpass supports in the volume of 705.6 m3.
  • Implementation of insulation from a fused strip on a resin base in the amount of 4360 m2.
  • Implementation of reinforced concrete sidewalk ledges in the volume of 284.15 m3.
  • Implementation of bridge deck drainage – transverse and longitudinal drainage of the bridge deck and installation of collectors from HDPE pipes in the length of 123.15 m.
  • Installation of safety elements – installation of protections against electric shock in the amount of 50.0 m, steel railings in the amount of 583.0 m and barriers in the amount of 583.0 m.
  • Implementation of surfaces – on the roadway: wearing course made of AS AKM 8S and base course made of cast asphalt AS 11W in the amount of 3 035.84 m2, on sidewalk ledges made of synthetic bitumen th. 5 mm in the amount of 1218.38 m2.
  • Implementation of flexible expansion joints based on modified polyurethane type POLYFLEX PA 15 in the amount of 232.0 m.
  • Repair with PCC mortars of the load-bearing structure – load-bearing beams type WBS and Płońsk as well as monolithic slabs in the amount of 8595.1 m2 and anti-corrosion protection of concrete surfaces in the amount of 9268.58 m2.
  • Securing the lower part of the load-bearing structure against nesting birds in the amount of 3510.0 m2.
  • Repair of LV road lighting power lines with a total length of 583.0 m and a value of 158,376.24 PLN without VAT.
 
 
  • Overpass length: 286.18 m
  • Overpass width: 15.26 m