Project description:
This project involved the reconstruction of roads, bridge repair, sidewalks, relocations of utility lines, sewage line, the extension of a two-track tram line by 735 m, installation of 4 tram stations, a new double-track loop, including its connection to the Medlánky depot via a 400 m two-track line.